Demolition & Excavating Insights
Tips, cost guides, and project stories from our crew — covering demolition, excavating, asbestos abatement, and site prep across Missouri, Kansas, and nationwide.
Owners: RFP Must Haves for Process Unit Dismantling
Contractor backed checklist for plant owners: RFP deliverables and regulatory musts (OSHA, asbestos NESHAP, RCRA) to verify before dismantling.
Defensible Emergency Demolition Procedures for Contractors
Compliance-first emergency demolition checklist for contractors: secure written authorization, run an expedited engineering survey, coordinate utilities,...
Owners: Use Procurement Rules to Enforce Demolition Waste Management
Make procurement enforce demolition waste management: require site specific waste plans, hazardous material surveys, and receipts as payment to show...
3 Documents Owners Must Demand Before Turbine Generator Removal
Ensure compliance on turbine generator removal: demand an engineering survey, a written lift plan, and waste manifests before mobilization.
Contractors: LCA Backed Concrete Recycling Cuts Costs Up to a Quarter
Actionable, project-focused guidance for contractors on concrete recycling: cut hauling and material costs, meet DOT specs, and capture LCA gains like a...
10–25 Tons Dump Trucking Capacities Contractors Must Calculate
Contractors: calculate legal dump truck loads with step by step math, 10–25 ton and 5–18 cubic yard ranges, cubic yard to ton conversions, and Bridge...
4 Phase Boiler Dismantling Workflow for Contractors: Avoid Enforcement
A compliance first, four phase boiler dismantling workflow contractors and engineers can document: OSHA engineering survey, verified zero energy...
Regulation First Industrial Demolition Safety Plan for Owners
A regulation-first, inspection-ready safety plan for industrial demolition. Maps each plan element to the OSHA and EPA citations owners must include to...
Contractors: 8 Safety Steps to Avoid Rework in Foundation Excavation Planning
Contractor's safety first pre dig plan: eight practical steps tied to OSHA and SWPPP triggers to avoid rework and set unit prices for rock and dewatering...